BUILDING BEER – WEEK 24

22
Oct
2015

WEEK 24

0e09b60d-4992-47be-a8f2-5d6d2df6dc29

It’s a race against the weather at this point, and although we did see snow here in Cazenovia over the weekend, the weather has warmed up and the guys are full throttle on the steel work.

d83bfc35-2184-413e-973c-92f0ce2b8003

0cd4d4c0-e22e-43a3-a207-d6d4b42687db

814fbbbf-7e5f-4223-a90c-23d3f2f0c231 da8030b3-96a4-4e82-85b1-106cf44996a0

The ceiling in the production area was installed to allow the pipe fitters to start running some sprinkler piping.

ef5a6666-623c-46e1-8dda-7d6c142acb30

16eb876b-7c07-4080-bc69-110ef9908c09

What do you do when the sprinkler piping will be exposed in the production area? You paint it fire engine red. The guys from J Meadows Sprinkler Co. only do the finest work with the highest quality finishes. Installation of the sprinkler system began last week and will continue through this week.

a291be2d-e631-4856-b514-9d16374e229b

Installation of retaining walls began outside of the basement entrance and patio area.