Building Beer – Week 3

11
Jun
2015

WEEK 3

d776be11-f340-4e7b-b75d-3c41dd8994c8

Despite the rain early last week, the crew was able to start working on Wednesday to install the drivewat entrance off Route 13!

1ee5b6bf-2623-4b72-83b0-ab5cdd69a8e6

e36119fc-b874-434c-affb-def7a4926ef4

Installation of the driveway entry.

 

acd5b4d5-dd6e-4bcc-9878-a99ab4d3df19

Excavation on the basement and back patio area has started.

a8e70a90-a6e4-4f69-877b-357470bae16d

Fill from the basement area was dumped and spread to continue building the roadway.

0345abbb-e115-45e2-808e-9c0ed22c7345

Friday morning they dropped off another bulldozer and began using some of the fill from the basement for grading out the building pad.